Awhile back I wrote about our bathroom reno. Since then we've done some more work to it and I thought it might be time for a quick update.

When I left you last we had a working toilet, a tub frame and some drywall on the walls.

We now have a fully dry walled bathroom. Complete with primer and paint. Wall and floor tiles are done (and I LOVE them). The tub is fully functional even though we don't have a shower curtain yet. Paul built our custom vanity. It's painted and there is a working sink. The pot lights are done and there's a light fixture over the vanity too!  My built ins have shelves but still need doors.

I'm so excited to see it almost done. Here's what's left to do:
- Possibly pick different paint (neither of us are thrilled with the current colour)
- Install doors for the built-in
- Find an awesome shower curtain
- Find an awesome mirror
- Trim
- Add necessary accessories (toilet paper holder, towel rack etc.)

It's a short and tedious list but I can see the finish line :)

Pictures to follow...eventually. 

1 comment:

  1. Anonymous1/26/2014

    I’m excited to read that the finish line is near. I truly am committed in my heart and god willing to cross that finish line with my son. I cherish every moment with him and his lovely little family. Once the weather warms up Paul and I will start a finial Reno journey together that will bring us all to new heights of adventure. The old man